大澳改善工程行人橋鋪設完成 大方公司供應RYOWA人造麻石材料
大澳改善工程第二期第二階段(合約編號IS/2022/01)之寶珠潭行人橋及鹽田行人橋現已完成鋪設並開放使用。寶珠潭行人橋全長約120米,鹽田行人橋全長約140米,兩橋落成後,大澳居民往返兩岸更為便捷,訪客亦可從新角度欣賞棚屋風貌。
大方公司於本項工程中供應RYOWA品牌訂製人造麻石鋪設材料,包括300×600×18mm人造麻石地磚,用作橋面主鋪材料;以及(142+50)×292×18mm L型人造麻石級咀磚,用於梯級邊緣防滑處理。L型級咀磚一體成形,包覆梯級邊緣,踏面與立面同色同紋,收邊平順,有效提升上落安全。
RYOWA人造麻石外觀接近天然花崗岩,規格統一、色差極少,防滑等級達R12,並經HOKLAS認可實驗室測試,可承受60噸消防車荷載,特別適用於橋面、海濱長廊等長期受日曬雨淋及高人流的戶外公共設施。
本工程由土木工程拓展署(CEDD)主管,總承建商為同利–中交四航院聯營(JV8002),工程顧問為邁進基建環保工程顧問有限公司(Meinhardt)。
大方公司自1983年創立至今,長期參與建築署、路政署、房屋委員會、土木工程拓展署及水務署之工程項目,並持有ISO 9001:2015認證。由落標報價、樣板確認到分批送貨,我們一直以穩定貨源及清晰技術文件配合承建商施工,致力為香港基礎建設提供優質建材。
如欲查詢產品資料或索取報價,歡迎致電(852) 2390 3381或WhatsApp 6249 9534與我們聯絡。
所有資料僅供參考,實際規格及價格以報價單為準。
Tai O Footbridge Paving Completed with RYOWA Artificial Granite Supplied by Tai Fong Company
The Po Chue Tam Footbridge and Yim Tin Footbridge under Tai O Improvement Works Phase 2 Stage 2 (Contract No. IS/2022/01) have been fully paved and are now open to the public. The Po Chue Tam Footbridge spans approximately 120 metres and the Yim Tin Footbridge approximately 140 metres. The completed bridges provide more convenient access for Tai O residents and offer visitors new vantage points over the stilt-house village.
Tai Fong Company supplied custom RYOWA artificial granite paving materials for this project, comprising 300×600×18mm artificial granite floor tiles as the main deck paving, and (142+50)×292×18mm L-shaped artificial granite nosing tiles for anti-slip stair edge treatment. The L-shaped nosing tiles are formed as a single piece that wraps the stair edge, with matching colour and texture on tread and riser for a clean finish and improved safety.
RYOWA artificial granite closely resembles natural granite in appearance while offering consistent dimensions and minimal colour variation. It achieves an R12 slip resistance rating and has been tested by a HOKLAS-accredited laboratory to withstand 60-tonne fire engine loading, making it particularly suitable for footbridges, promenades and other outdoor public facilities exposed to weather and heavy pedestrian traffic.
The project is administered by the Civil Engineering and Development Department (CEDD), with Tung Lee – CCCC-FHDI Joint Venture (JV8002) as main contractor and Meinhardt Infrastructure and Environment Ltd as consultant.
Established in 1983, Tai Fong Company has long participated in projects under the Architectural Services Department, Highways Department, Hong Kong Housing Authority, Civil Engineering and Development Department and Water Supplies Department, and is ISO 9001:2015 certified. From tender quotation and sample confirmation to phased delivery, we support contractors with reliable supply and clear technical documentation.
For product enquiries or quotations, please contact us at (852) 2390 3381 or WhatsApp 6249 9534.
All information is for reference only. Actual specifications and prices are subject to formal quotation.